top of page

GRADING

 EXCAVATION

MID MAIN CANAL RESERVOIR

Modesto Irrigation District

Project involved the transformation of a 52 acre parcel into a 265 acre foot reservoir that was then tied into the existing canals. Work included excavation,shotcrete lining, installation of various sizes of pipe and placing of concrete. Additional work items included the construction of CMU structures, spillway and flume structures, installation of bridges and canal gates. Our in house team designed and fabricated handrails, guardrails and catwalks that span the canal. Work for this project was successfully completed during a critical shutdown of the canal system in the winter of 2019-2020.

TC JAIL ACCESS ROAD AND TRANSIT CENTER

Tuolumne County

The TC Jail Access Road and Transit Center extended the existing backbone infrastructure at the TC Law and Justice Center including construction of a new transit building and bus shelter. The project included mass excavation, hard rock excavation, site grading and paving, dry and wet utilities, concrete flatwork, structural cast-in-place retaining walls.

bottom of page